A renewal date is not an insurance review. If your gang has grown, you have taken on a bigger contract, bought a lorry or started hiring more kit, last year’s policy may no longer match the job. This insurance review checklist helps scaffolders check the details that can make a real difference when a client asks for proof of cover or a claim lands on the desk.
Less time chasing paperwork, more time focusing on the job. Set aside half an hour with your current policy schedule, renewal documents and a clear picture of the work you expect to carry out over the next 12 months.
Start with the work you actually do
Insurers price and assess the risk they are being asked to cover, not the version of the business you were when the policy first began. Start by checking your trade description. It should reflect the scaffolding activities you undertake, whether that is domestic access scaffolding, commercial projects, industrial work, temporary roofs, design work or labour-only subcontracting.
Be clear about the highest-risk jobs in the diary too. Work on busy roads, pavements, rail-adjacent sites, schools, public buildings and complex industrial locations can all affect the cover required. So can work at height. Do not assume a policy covers every height simply because it is labelled for scaffolders. Check the wording, endorsements and schedule for height restrictions or other conditions. If unlimited-height-risk cover is needed for your contracts, that needs to be arranged specifically.
Turnover and payroll matter as well. A healthy year can change the size of a claim an insurer expects to face, while taking on more labour changes your employers’ liability exposure. Understating either can create problems at renewal or when making a claim.
Insurance review checklist: liability cover
Public liability is normally the first document a site manager, local authority or principal contractor wants to see. It can respond if your work causes injury to another person or damage to their property. Think of a falling fitting that damages a parked car, or a member of the public injured after walking into an inadequately protected work area.
Check the limit, not just whether you have cover. Many scaffolding firms choose £5 million or £10 million public liability because clients, contracts and pavement or highway permits may require it. The right limit depends on where and how you work, but a lower limit that fails a contract requirement is not much use when the job is ready to start.
Also review the extensions and exclusions. Ask whether the policy reflects work away from your premises, manual work, work at height, temporary works and the types of sites you attend. If you use subcontractors, establish exactly how they are engaged and whether they carry their own public liability cover. A labour-only worker may be treated very differently from a bona fide subcontractor with their own business and insurance.
Employers’ liability deserves the same attention. In most cases, UK businesses that employ staff are legally required to hold at least £5 million of employers’ liability cover, although policies commonly provide £10 million. The rules can be more complicated where family members, labourers or casual workers are involved, so it is sensible to describe who works for you rather than relying on job titles alone.
Check vehicles, drivers and road risks
A scaffolding vehicle is more than transport. It carries materials, supports the day’s programme and may be parked near a live work area. Review every van, pickup, lorry and trailer that the business owns, leases or regularly uses. Make sure registrations, vehicle use and estimated mileage are current.
Business use must match reality. A policy that only reflects commuting and light business use may not suit a vehicle carrying scaffolding to multiple sites, towing a trailer or being used by several employees. Check named drivers, age restrictions, licence requirements and any rules around convictions or previous claims.
Do not overlook goods carried in vehicles. Tools and equipment can be vulnerable when left in a van overnight, especially if the vehicle is parked at home, on the street or at an unsecured compound. The policy may set security conditions, such as removing items from the vehicle or using approved locks. Those conditions need to be practical enough to follow on a wet Wednesday after a long shift.
Value tools, equipment and plant properly
Replacing a few fittings is one thing. Replacing a full kit after theft, fire or accidental damage can stop work completely. List your tools and equipment with realistic replacement costs, not what you paid for them years ago. Include power tools, lasers, harnesses, hand tools, radios, generators, temporary lighting and storage equipment.
Then separate what you own from what you hire. Own plant and hired-in plant are usually insured differently. If a hired hoist, telehandler or other item is damaged or stolen, the hire agreement may leave you responsible for more than you expect, including continuing hire charges. Check the agreement before the equipment arrives on site and make sure the insurance limit reflects the maximum value you could have on hire at one time.
Contract works cover is worth reviewing whenever you take responsibility for materials or unfinished work. A storm, fire, vandalism or theft can damage work that has not yet been handed over. The contract, not common sense, often decides who carries that risk. Read the insurance clauses before signing, especially on larger commercial jobs.
Review the details that claims teams will ask for
Good cover can still be tested by missing information. Check your business address, trading name, legal structure and contact details. If you have moved from sole trader to limited company, for example, the policy should be in the right name. Check the excesses too. A lower premium with a high excess can be sensible for some firms, but only if paying that amount would not put pressure on cash flow after a loss.
Claims history should be accurate, including incidents that were notified but did not result in a payment. Be open about anything material that has changed, such as a serious accident, prosecution, insolvency history or an insurer declining or cancelling cover. It is better to discuss an awkward detail upfront than to discover it was relevant when support is needed most.
Keep key documents where they can be found quickly. That includes liability certificates, motor insurance details, plant hire agreements, risk assessments, inspection records, driver information and photographs or receipts for higher-value equipment. For public liability claims, site records and photos taken immediately after an incident can be especially useful.
Match the policy to your contracts
Before agreeing to a new job, compare its insurance requirements with your schedule. Clients may specify liability limits, require proof of employers’ liability, ask for contract works cover or impose conditions relating to vehicles, road closures and permits. Do not simply send a certificate and assume it meets the requirement.
This is also the point to consider cover that protects the business beyond physical damage. Legal expenses cover may help with certain employment, contract or tax-related disputes, subject to the policy terms. Personal accident cover can provide a financial benefit following a covered injury, which can be valuable for self-employed scaffolders whose income depends on being able to work.
When to run the checklist
Run a full review before renewal, but do not wait a year if the business changes. Review cover when you win a larger contract, employ your first worker, add vehicles, buy or hire more plant, move premises, start working at greater heights or take on unfamiliar types of work.
A specialist broker can help turn those operational changes into clear insurance requirements rather than a confusing list of policy terms. Scaff Cover can review the risks around your work, equipment and contracts, then approach suitable insurer markets for cover that fits the way your business operates.
The best time to find a gap in cover is before the scaffold goes up. Keep the policy aligned with the jobs you are taking on, and you give your business a far better chance of carrying on when something goes wrong.

